Monday, February 25, 2013
Flooring / trim install
I talked to the flooring and trim guys and everything has been moving along. They were finishing up the kitchen and the trim guy would be moving cabinets into there soon enough, maybe later today. The last picture is the master bathroom. While I would be cautious using marble, this is only our bathroom and we'll be using a synthetic countertop to match (post close or so). It was also good to see with the upgraded trim we get 6 inch trim along the bottom of every room in the house. Reminder: final paint hasn't been applied, not a fan of the beige up right now.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment